Waste Heat Recovery from Hot Blast Stoves of ESSAR Steel Hazira Limited
[]
Host party(ies) India
Methodology(ies) ACM0012 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 142,541
Start date of first crediting period. 01 Jun 10
Length of first crediting period. 10 years
DOE/AE RINA Services S.p.A.
Period for comments 27 Jan 10 - 25 Feb 10
PP(s) for which DOE have a contractual obligation ESSAR steel Hazira Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (486 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1.	How many CDM projects are registered/under registration processes at Essar, Hazira?
2.	Is there any possibility to bundle all Essar CDM projects?
3.	How many local people were employed in last 3 years by Essar, as discussed during stake holder meeting?
4.	What is role and benefits for Denmark based partner?
5.	Monitoring is proposed only for generated CER (reduced GHG during that period), what about pollution generated from other plant in same premises? If GHG emitted from other plant, what will be monitoring criteria for that?
6.	Annexure B shows 2% CER revenue expenditure plan. But it shows yearly CER revenue in euro and there is no expenditure plan shown in it.
From
Hiral Mehta/Mahesh Pandya
Environmental Engineers
Paryavaran mitra
502, Raj Avenue, Bhaikakanagar road
Thaltej, Ahmedabad - 380059
Telefax - 079-26851321/1801
Submitted by: paryavaranmitra


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs