Grid Connected Solar Power Project in Gujarat by GHI Energy Private Limited
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 16,127
Start date of first crediting period. 31 Jan 12
Length of first crediting period. 7 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 20 Oct 11 - 18 Nov 11
PP(s) for which DOE have a contractual obligation GHI Energy Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1082 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
•	Why this location has been chosen for this project?
•	Will this project have impact on temperature in surrounding area?
•	What would be impact of negative environmental conditions of area upon project? What would be alternatives in that case?
•	How many skilled/unskilled people from surrounding area will be employed at this project during commissioning and operation? 
•	List of stakeholders and minutes of stakeholder meeting is not attached with PDD.

From
Mahesh Pandya
Environmental Engineer
Paryavaran mitra
502, Raj Avenue, Bhaikakanagar road
Thaltej, Ahmedabad – 380059 India
Telefax - 079-26851321/1801
Submitted by: paryavaranmitra

. Gujarat forum on CDM respectfully submit the following comments on the Project Design Document (PDD) for Solar Power Project by GHI Company in Gujarat, India. We thank the CDM Executive Board and Designated Operation Entity (DOE) for recognizing the integral role of transparency in CDM Validation process, and for taking this comment into consideration.
The project is not appropriate for the following points

o	No justification has been given regarding the selection of sites for installation of Solar Power Project and how much land has been acquired for the purpose?

o	No information has been provided about the acquired land and its previous use.

o	No commitment has been shown by the company regarding sustainable development as well as additionality as per CDM requirement?

o	In local stakeholder’s consultation meeting, only 21 stakeholders were presented. The low participation of stakeholders shows that company had not taken it seriously. The company had not made adequate efforts to inform and aware stakeholders regarding consultation. By which way the project proponent inform the stakeholder about the consultation meeting – through newspaper notice or else?

Gujarat forum on CDM
gujaratforumoncdm@gmail.com
Submitted by: Gujarat Forum on CDM


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs