4×200 MW Level Natural-gas-fired Combined Cycle Power Plant of Ningxia East Thermal Power Co., Ltd.
[]
Host party(ies) China
Methodology(ies) AM0048 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 1,082,243
Start date of first crediting period. 01 Apr 12
Length of first crediting period. 10 years
DOE/AE PJR CDM
Period for comments 17 Nov 11 - 16 Dec 11
PP(s) for which DOE have a contractual obligation Ningxia East Thermal Power Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (807 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs