ANAEROBIC DIGESTION OF ANIMAL MANURE WITH ON-SITE POWER PROJECT, CYPRUS
[]
Host party(ies) Cyprus
Methodology(ies) AMS-III.AO.
AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 28,273
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 10 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 13 Apr 11 - 12 May 11
PP(s) for which DOE have a contractual obligation G. & AF. Energy Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1202 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs