Wind energy based electricity generation project located at Manur and Vakaikulam, Tirunelveli district, Tamilnadu, India
[]
Host party(ies) India
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 36,935
Start date of first crediting period. 01 Jul 11
Length of first crediting period. 10 years
DOE/AE LRQA Ltd
Period for comments 22 Feb 11 - 23 Mar 11
PP(s) for which DOE have a contractual obligation Paharpur Cooling Towers Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (644 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The purpose of the proposed project activity is not provided in the section A.2 of the PDD. Please clarify.
2.	How GHG emission is reduced due to the project activity is not demonstrated in the PDD. Please clarify. 
3.	The break up mentioned in the section B.4 doesn’t match with URL at the footnote. Pls. explain. 
4.	The calculation of project IRR is not as per “Guidance on the Assessment of Investment Analysis’ Version 03, EB 51, Annex 58”.
5.	Whether pre-tax or post tax IRR is selected is not demonstrated in the PDD.
6.	The basis of calculation of benchmark is not documented in the section B.5. PLR is not acceptable benchmark for the project. WACC based on Government bonds, risk premiums should be taken.
7.	Why PP not taken PLF for sensitivity analysis with  project cost, tariff and O&M cost.
8.	Derating factor, array efficiency of the wind energy system is not depicted in the PDD. Pls. clarify. 
9.	Debt/Equity ratio should be based on recent investment done by the Project proponent. 
10.	Prior consideration of CDM which is important for the determination of additionality is not documented in the section B.5 of the PDD.  

Submitted by: lasith