N2O Abatement Project of Capro Corporation
[]
Host party(ies) Republic of Korea
Methodology(ies) AM0028 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 665,182
Start date of first crediting period. 01 Sep 10
Length of first crediting period. 10 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 16 Dec 09 - 14 Jan 10
PP(s) for which DOE have a contractual obligation Capro Corporation Hyosung Ebara Engineering Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1953 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs