Process waste heat utilization for the generation of power at carbon black manufacturing unit at PCBL-Mundra
[]
Host party(ies) India
Methodology(ies) ACM0012 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 57,380
Start date of first crediting period. 11 Feb 10
Length of first crediting period. 10 years
DOE/AE LRQA Ltd
Period for comments 12 Aug 09 - 10 Sep 09
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (530 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:

The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs