Pantabangan Hydro Electric Power Plant Refurbishment and Upgrade Project in Nueva Ecija, Philippines
[]
Host party(ies) Philippines
Methodology(ies) ACM0002 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 56,807
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 7 years
DOE/AE DNV-CUK
Period for comments 07 Jul 10 - 05 Aug 10
PP(s) for which DOE have a contractual obligation First Gen Hydro Power Corporation (FGHPC)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (985 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs