Fujian Pingnan Lidaping 20MW Hydropower Expansion Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 10
Standardised Baselines N/A
Estimated annual reductions* 49,843
Start date of first crediting period. 01 May 10
Length of first crediting period. 7 years
DOE/AE China Environmental United Certification Center Co., Ltd.
Period for comments 31 Dec 09 - 29 Jan 10
PP(s) for which DOE have a contractual obligation EDF Trading Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (952 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs