Guohua Wulate Zhongqi Chuanjing Phase II Wind Farm Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 10
Standardised Baselines N/A
Estimated annual reductions* 123,127
Start date of first crediting period. 01 Mar 10
Length of first crediting period. 7 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 04 Feb 10 - 05 Mar 10
PP(s) for which DOE have a contractual obligation Guohua Bayannaoer (Wulate Zhongqi) Wind Power Co.,Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (330 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs