Landfill Gas Capture and Utilization at Ras-Al-Khaimah
[]
Host party(ies) United Arab Emirates
Methodology(ies) ACM0001 ver. 17
Standardised Baselines N/A
Estimated annual reductions* 85,619
Proposed start date of PA 30 Mar 17
Start date of first crediting period. 30 Mar 17
Length of first crediting period. 7 years
DOE/AE CarbonCheck_Cert
Period for comments 17 Dec 16 - 15 Jan 17 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation Green Energy Solutions and Sustainability LLC
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1326 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs