Shangwulipu Hydro Power Project
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 15
Standardised Baselines N/A
Estimated annual reductions* 36,312
Start date of first crediting period. 01 Jul 10
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 22 Dec 09 - 20 Jan 10
PP(s) for which DOE have a contractual obligation Wushi County Pengyuan Hydropower Development Co.,Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (299 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Two hydropower station, yamansu and huojian were closed due to Shangwulipu station. I wonder how to calculate ER, should it be included in the leakage? Since AMS.I.D didn't have the introduction on how to calculate this part.
Submitted by: XinjiangCDM


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs