Ranhill Powertron II 190 MW Gas Fired CCPP Project
[]
Host party(ies) Malaysia
Methodology(ies) AM0029 ver. 3
Standardised Baselines N/A
Estimated annual reductions* 407,125
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 7 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 17 Sep 10 - 16 Oct 10
PP(s) for which DOE have a contractual obligation Sindicatum Carbon Capital Ltd
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (894 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs