Grid connected energy efficient power generation in Jhajjar, Haryana
[]
Host party(ies) India
Methodology(ies) ACM0013 ver. 2
Standardised Baselines N/A
Estimated annual reductions* 2,074,695
Start date of first crediting period. 01 Jan 12
Length of first crediting period. 10 years
DOE/AE SIRIM
Period for comments 19 Jan 10 - 17 Feb 10
PP(s) for which DOE have a contractual obligation Jhajjar Power Limited (JPL)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (777 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (37 KB) Submitted by: Guido Sabatini

Comment (37 KB) Submitted by: Guido Sabatini

Comment (37 KB) Submitted by: Guido Sabatini

Comment (802 KB) submitted by: Bruce Ho on behalf of Stanford Environmental Law Clinic on Behalf of CDM Watch


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs