Installation of Waste Heat Recovery System at SO3 absorption towers by Indian Farmers Fertiliser Cooperative Ltd IFFCO, Paradeep unit, Orissa
[]
Host party(ies) India
Methodology(ies) ACM0012 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 99,514
Start date of first crediting period. 01 Nov 12
Length of first crediting period. 10 years
DOE/AE KBS Certification Services Limited
Period for comments 05 May 12 - 03 Jun 12
PP(s) for which DOE have a contractual obligation Indian Farmers Fertiliser Cooperative Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (642 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs