Guodian Weifang Binhai Wind Farm Phase I Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 96,316
Start date of first crediting period. 01 Jun 12
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 05 Jan 12 - 03 Feb 12
PP(s) for which DOE have a contractual obligation Guodian Shandong Electric Power Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1096 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The project started construction on Aug. 11, 2010 (http://news.163.com/10/0818/05/6EBI1UTP00014AED.html; http://www.china5e.com/show.php?contentid=121355)
Submitted by: fengdian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs