Jiangsu Jiaoqiao Cement Plant’s Low Temperature Waste Heat Power Generation Project
[]
Host party(ies) China
Methodology(ies) AM0024
Standardised Baselines N/A
Estimated annual reductions* 22,087
Start date of first crediting period. 01 Apr 08
Length of first crediting period. 10 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 19 Sep 07 - 18 Oct 07
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website