Solar Power Project in Gujarat, India by Waa Solar Private Limited
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 13,111
Start date of first crediting period. 01 Mar 12
Length of first crediting period. 10 years
DOE/AE RINA Services S.p.A.
Period for comments 20 Sep 11 - 19 Oct 11
PP(s) for which DOE have a contractual obligation Waa Solar Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (461 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
As per the Link (http://law.incometaxindia.gov.in/DitTaxmann/IncomeTaxActs/2006ITAct/sec_080-ia.htm) 80 IA benefit given to infrastructure project was incorporated before November 2001, was the policy or benefit considered in Baseline calculation or Project scenario calculation.

Also 80% Accelerated depreciation is also present in Income tax Act 1961 for solar and wind project equipments well before November 2001, was the same considered in the calculation of baseline scenario and project scenario.
Submitted by: Arnab deb