Electricity and heat Generating through a cogeneration system in Gerencia Refinerķa Barrancabermeja (GRB), Ecopetrol, S.A.
[]
Host party(ies) Colombia
Methodology(ies) AMS-II.B. ver. 9
AM0014 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 78,089
Start date of first crediting period. 01 Jan 15
Length of first crediting period. 7 years
DOE/AE AENOR INTERNACIONAL, S.A.U.
Period for comments 25 Jan 13 - 23 Feb 13
PP(s) for which DOE have a contractual obligation Ecopetrol, S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1977 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs