Xinrong Phase II Wind Power Generation Project in Shanxi Province
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 83,534
Start date of first crediting period. 01 Feb 13
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 01 May 12 - 30 May 12
PP(s) for which DOE have a contractual obligation Shanxi International Energy Group New Energy Investment and Management Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (563 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
It is written in PDD that "The notice has been at the website of Shanxi International Energy Group for a long time". However the notice was published on April 28, 2012 at the website (http://webcache.googleusercontent.com/search?q=cache:bk_XG_Ur31wJ:http://www.sxgjny.com/sxgjxny/SubComDetail.aspx%3FRecordId%3D1436%26comId%3D98%26catalogId%3D196%26tp%3DPro%26SubCatalogID%3D25%26menuid%3D4%2Bhttp://www.sxgjny.com/sxgjxny/SubComDetail.aspx%3FRecordId%3D1436%26comId%3D98%26catalogId%3D196%26tp%3DPro%26SubCatalogID%3D25%26menuid%3D4&hl=zh-CN&gbv=2&prmd=ivns&strip=1), even later than the PDD completion date. There is no time for comments collection from local stakeholders before validation starts.
Submitted by: fengdian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs