Huadian Jilin Shuangliao Namusi 49.5MW Wind Power Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 95,492
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 7 years
DOE/AE TÜV SÜD South Asia Private Limited
Period for comments 27 Mar 12 - 25 Apr 12
PP(s) for which DOE have a contractual obligation Arreon Carbon Trading Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (599 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
How was the local stakeholder consultation taken? Is there any due dilligence in the process? Why was the 30th wind turbine installed against national standard?

http://v.youku.com/v_show/id_XMzc2NDM1MzQ0.html
http://t.qq.com/p/t/118577018798196
Submitted by: fengdian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs