4 MW Small Hydro Project by Shansha Hydro Power Project Co-Operative Society Ltd.
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 18
Standardised Baselines N/A
Estimated annual reductions* 18,720
Proposed start date of PA 01 Feb 16
Start date of first crediting period. 01 Jan 17
Length of first crediting period. 10 years
DOE/AE Earthood Services Private Limited
Period for comments 01 Sep 15 - 30 Sep 15 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation The Shansha Hydro Power Project Co-Operative Society Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1189 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:

The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs