10.8 MW Wind Power Project by Ruchi Infrastructure Limited
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 13
Standardised Baselines N/A
Estimated annual reductions* 19,429
Start date of first crediting period. 01 Aug 09
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 16 May 09 - 14 Jun 09
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (429 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
As per section B.5 page 16 of the PDD it shows the IRR without CDM is 5.21% and considering the CDM revenue @ 16 Euro comes out to be 7.13%, where as the benchmark IRR is 14.46%.The project IRR is half of the benchmark. So even after considering the CDM revenue  the project is still not viable. Hence the DOE is requested to check the viability of the project even after considering the CDM revenue.
Submitted by: Malay Mondal

requesting DOE to ignore my earlier comment on the project. the same need not be taken into account for project validation.
Submitted by: Malay Mondal


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs