Jiangxi Yuanshengyuan Chemical Co., Ltd. Alcohol Wastewater Methane Recovery and Power Generation Project
[]
Host party(ies) China
Methodology(ies) ACM0014 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 163,241
Start date of first crediting period. 01 Jun 12
Length of first crediting period. 10 years
DOE/AE RINA Services S.p.A.
Period for comments 21 Apr 12 - 20 May 12
PP(s) for which DOE have a contractual obligation FC2E Gestión S.L.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1731 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs