Methane Recovery and Utilisation at PT. Unggul Lestari Palm Oil Mill at Central Kalimantan, Indonesia.
[]
Host party(ies) Indonesia
Methodology(ies) AMS-III.H. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 52,209
Start date of first crediting period. 17 Oct 12
Length of first crediting period. 10 years
DOE/AE DNV-CUK
Period for comments 24 Aug 11 - 22 Sep 11
PP(s) for which DOE have a contractual obligation PT. Unggul Lestari
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (577 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Clarification needed for this project activity on the uncertainty factor that should be applied to baseline emission sources, because the baseline is determined through measurement campaign and historical data is not available.
Submitted by: Asrulnizam Alias


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs