Hubei Donggou Hydropower Project
[]
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 31,541
Start date of first crediting period. 01 Jun 12
Length of first crediting period. 7 years
DOE/AE Korean Foundation for Quality
Period for comments 08 Nov 11 - 07 Dec 11
PP(s) for which DOE have a contractual obligation Climate Bridge Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (875 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
According to local DRC report (http://fgj.zhuxi.gov.cn/E_ReadNews.asp?NewsId=330), the project was already under construction in 2008. CDM was not considered during project development.
Submitted by: shuidian

According to local DRC report (http://fgj.zhuxi.gov.cn/E_ReadNews.asp?NewsId=330), the project was already under construction in 2008. CDM was not considered during project development.
Submitted by: shuidian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs