Boiler retrofit and fuel switch in Shenxing power plant
[]
Host party(ies) China
Methodology(ies) ACM0012 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 236,373
Start date of first crediting period. 01 Jul 12
Length of first crediting period. 10 years
DOE/AE SGS-UKL
Period for comments 15 Oct 11 - 13 Nov 11
PP(s) for which DOE have a contractual obligation Shenmu County Zhugaita Integrated Resource Utilization and Power Generation Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (530 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs