ANAEROBIC DIGESTION SWINE WASTEWATER TREATMENT WITH ON-SITE POWER PROJECT (ADSW RP2024)
[]
Host party(ies) Philippines
Methodology(ies) AMS-III.D. ver. 14
AMS-I.D. ver. 13
Standardised Baselines N/A
Estimated annual reductions* 46,622
Start date of first crediting period. 01 Jan 09
Length of first crediting period. 7 years
DOE/AE SGS-UKL
Period for comments 01 Oct 08 - 30 Oct 08
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (412 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs