Lanzhou Fulongping Landfill Gas Recovery for Power Generation
[]
Host party(ies) China
Methodology(ies) ACM0001 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 103,567
Start date of first crediting period. 01 Jun 12
Length of first crediting period. 10 years
DOE/AE Germanischer
Period for comments 22 Jul 11 - 20 Aug 11
PP(s) for which DOE have a contractual obligation Vitol S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1100 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Landfill project in China is profitable without CDM revenue according to past experience. O&M cost of this project is obviously overestimated in FSR. Average O&M cost of landfill power generation project is about 0.1CNY/kWh without considering fuel cost (http://ditan.jnustu.net/html/ditanjishu/nenyuanjishu/20110324/7365.html). If applying 0.1CNY/kWh in the project, total O&M cost would be 1.26 mil. CNY annually. IRR is higher than 12%. If applying the example with same installed capacity indicated in the webpage, O&M cost is about 1.6 mil. CNY, IRR is still close to 10%, much higher than 5% benchmark.
Submitted by: jia.wan


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs