Bundled Grid Connected Wind Power Generation –Abi Energy Bundle 3
[]
Host party(ies) India
Methodology(ies) AMS-I.F.
AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 18,694
Start date of first crediting period. 01 Nov 10
Length of first crediting period. 10 years
DOE/AE LRQA Ltd
Period for comments 21 Jul 10 - 19 Aug 10
PP(s) for which DOE have a contractual obligation Abi Energy Consultancy Services Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (301 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
As the IRR calculated for the project is Post tax then shouldn't the benchmark assumed be also tax adjusted, and consequentially be adjusted with the applicable Tax rate during the decision making time.
Submitted by: Arnab deb


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs