Maibarara Geothermal Power Project
[]
Host party(ies) Philippines
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 134,816
Start date of first crediting period. 01 Aug 13
Length of first crediting period. 7 years
DOE/AE AENOR INTERNACIONAL, S.A.U.
Period for comments 06 Sep 11 - 05 Oct 11
PP(s) for which DOE have a contractual obligation Maibarara Geothermal, Inc.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1620 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs