Hengshui TEDA Gucheng Biomass-based Power Generation Project
[]
Host party(ies) China
Methodology(ies) ACM0018
Standardised Baselines N/A
Estimated annual reductions* 123,612
Start date of first crediting period. 01 Apr 13
Length of first crediting period. 7 years
DOE/AE DNV-CUK
Period for comments 06 Jan 12 - 04 Feb 12
PP(s) for which DOE have a contractual obligation Climate Bridge Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1622 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Wheat straw used in the project is not documented in PDD, referring http://xxgk.hengshui.gov.cn/zfxxgk/html/10/200911052548/2011/2011-47074.html or http://cms.hengshui.gov.cn/cms/cms/website/hsgc/hsgc/info.jsp;jsessionid=0a646410ce59b609b6ff7ba48ceb51d92171d9a0305.rxeSa2OLbxCNaN0Lcybtah0Iah0K-x4Ka2SLbwSLch5yc6aL-x4Mb3uPbNvvc6eT-wOSa30K8QvNmQPN-BmOc30Hahmxb3uPc3uOah4M8Oexo6XHngbynknvrkLOlQzNp65In0__?debug=true/ch3035/ch3048/index.shtml&channelId=3048&siteId=68&publishtime=1325174400000&infoId=224767
Submitted by: jia.wan


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs