Xinjiang Akeyazi River Simutasi Hydropower Station Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 263,929
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 7 years
DOE/AE TUEV-RHEIN
Period for comments 07 May 10 - 05 Jun 10
PP(s) for which DOE have a contractual obligation Gezhouba Yili Hydropower Development Co., Ltd.
Eco Asset Incorporated
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (685 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs