China Petroleum Western Pipeline Xinjiang branch heat medium heater combustion medium oil to gas project in Shanshan station branch
[]
Host party(ies) China
Methodology(ies) AMS-III.B. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 10,366
Start date of first crediting period. 01 Jul 13
Length of first crediting period. 10 years
DOE/AE LGAI Technological Center, S.A.
Period for comments 11 May 13 - 09 Jun 13
PP(s) for which DOE have a contractual obligation China Petroleum western pipeline Xinjiang branch
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (834 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs