Hunan Linwu Sanshiliuwan 48MW Wind Power Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 87,826
Start date of first crediting period. 01 Sep 12
Length of first crediting period. 7 years
DOE/AE LRQA Ltd
Period for comments 18 Jan 12 - 16 Feb 12
PP(s) for which DOE have a contractual obligation Climate Bridge Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1896 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs