Capture and processing low pressure associated gas from the Neft Dashlari and Palchiq Pilpilassi oil fields of SOCAR
[]
Host party(ies) Azerbaijan
Methodology(ies) AM0009 ver. 4
Standardised Baselines N/A
Estimated annual reductions* 202,909
Start date of first crediting period. 01 Mar 10
Length of first crediting period. 10 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 11 Jun 10 - 10 Jul 10
PP(s) for which DOE have a contractual obligation GAZPROM Germania GmbH
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1648 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs