KL Rathi Steels 4.5 MW Wind Power Project at Jaisalmer District, Rajasthan
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 16
Standardised Baselines N/A
Estimated annual reductions* 6,696
Start date of first crediting period. 01 Aug 11
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 12 Feb 11 - 13 Mar 11
PP(s) for which DOE have a contractual obligation KL Rathi Steels Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (665 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
Purpose of the project and how the proposed project activity reduces greenhouse gas emissions are not briefed in the PDD. Refer section A.2.
.How environmentally safe and sound technology is used for the project and details of technology transfer is not demonstrated adequately. Refer A.4.2
•Non- debundling nature of the project activity is not adequately justified as per EB54 Annex 13 (Debundling tool). Refer A.4.5
•Why has option A (Combined margin) been chosen for calculating emission factor is not justified. Refer B.6
•The justification of choosing IRR as financial indicator is not adequately justified. Whether it is equity or project IRR, pre-tax or post tax is not mentioned in the PDD. 
•Basis of choosing PLR as benchmark is not adequately demonstrated in the PDD 
•All the issues of investment analysis guidelines are not discussed in the PDD. Refer B.5. 
•Justification of parameters including O&M, insurance, loan, derating, escalation, and tariff are not demonstrated with justification. Refer B.5.
•Please provide a proof for proposed debt to equity taken at the investment decision. Refer B.5
•Proof for PLF is not justified. 
•Date of offer is not provided  
•IT rate assumed is not as per standard practice. 
•CER revenue assumed is not consistently applied
•Benchmark calculation is not as per WACC tool (EB53 Annex 8)
•Date of PPA is not mentioned in the prior consideration of CDM
•The selection of simple OM based on low cost/must run resources is not adequately justified. Refer B.6.1
•Ex-ante option of calculating OM is not adequately demonstrated. Step 3 of Refer B.6.1

Submitted by: Fleming

Favoring the Tariff considered for Financial analysis:

Referring RERC tariff order dated 16/07/09, the tariff for wind power plants to be commissioned during the FY 2009-10 in Jaisalmer, Barmer and Jodhpur District is Rs 4.28/KWh, which is fixed for 20 years. Also as per RERC terms & Condition for Tariff regulation dated 23/01/09, refer para 85 which depicts,"..Under these Regulations, the Commission has specified ‘normative capital cost for the base year of Control Period and corresponding Tariff to be applicable for the projects to be commissioned in Base Year of Control Period. The ‘Tariff’ for wind Projects for commissioning during each subsequent year  of control period shall be indexed as per formula.."

So, the average tariff of INR 3.94/kWh which is being considered for the IRR calculation, is not justifiable. 

The DOE is therefore requested to critically analyze this in accordance with the stated statuary guidelines and PPA favoring the above said context.
Submitted by: Abhishek Kumar

The PP states that they have considered 80% accelerated depreciation. However the PDD is silent on the tax shielding as a result from accelerated depreciation.
PPs cleverly do not consider the accounting tax offsetting in their companies while calculating the IRR. This is evident from the recently registered projects and those requesting registration.  

The DOE is therefore requested to critically analyze how the accelerated depreciation benefit has been taken into account and confirm the accounting of the cash inflows as a result of the negative tax liability in the initial years. DOE should not be misguided by the financial presented by the PP or consultant which are custom made for CDM purposes and not the actual financial considered at the investment decision.
Note that considering cash inflows results in an increase in the IRR making wind projects a profitable venture.

Please also check the offer from WTG supplier and Purchase Order while validating the PLF. It may be so that the third party report may indicate a lower PLF.

Benchmark: 
No details are provided on the beta estimation. Is the beta levered or unlevered and what is the reason?? How is the beta appropriate for chosen irr?

Stakeholder consultation:
No details provided on which all stakeholders attended the meeting. 
Submitted by: Babloo

Please also check the offer from WTG supplier and Purchase Order while validating the PLF. It may be so that the third party report may indicate a lower PLF. When the tariff order indicates a higher PLF of 22% and that too at the substation then how come a lower PLF of 19% at controller is considered as conservative??? This clearly indicates the third party report is forge...

The PDD is not at all transparent. The PP and DOE have deliberately not included any of the input parameter used for proving the financial additionality!! How can a DOE webhost such a incompelte PDD??? Its high time EB has to take action on such malpractices. How come the DOE missed this critical element in their completeness check???

How has the beta calculated for the CAPM benchmark? How the equity beta was calculated? WHether equity beta is appropriate for CAPM and comparing against equity IRR? DOE must be well versed with the financials for validating the benchmark and financial analysis.

Is there any REC benefit claimed by the PP?

Page 14 of PDD indicates cost per MW of Rs 58.6 million / MW giving reference to RERC order. Also check http://www.rerc.gov.in/Tenders_for_Works.pdf which is again an RERC order indicating a cost of Rs 52.5 million/MW. As the project cost for the project is not at all mentioned in teh PDD - deliberately by the PP. DOE to check whether it is reasonable.
Submitted by: Babloo

The benchmark is 15.64%. Even after considering CDM benefits the IRR is coming 13.91%. Then WHY did the PP go ahead with this non-profitable venture??
This clearly indicates the benchmark is made high just to prove additionality and is not the real benchmark expected by the PP.
Submitted by: Babloo


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs