TPI Polene Power Waste Heat Recovery Power Plant Project, Thailand (TPIPP WHR Project)
[]
Host party(ies) Thailand
Methodology(ies) AM0024 ver. 2
Standardised Baselines N/A
Estimated annual reductions* 160,564
Start date of first crediting period. 01 Apr 11
Length of first crediting period. 10 years
DOE/AE TÜV NORD CERT GmbH
Period for comments 18 Oct 10 - 16 Nov 10
PP(s) for which DOE have a contractual obligation TPI Polene Power Co., Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1299 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs