13.65 MW Wind Power Project of Khatau Narbheram & Co. in Tamil Nadu, India
[]
Host party(ies) India
Methodology(ies) AMS-I.D. ver. 17
Standardised Baselines N/A
Estimated annual reductions* 29,078
Start date of first crediting period. 01 Jan 13
Length of first crediting period. 10 years
DOE/AE URSCert
Period for comments 27 Jul 12 - 25 Aug 12
PP(s) for which DOE have a contractual obligation Khatau Narbheram & Co.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (546 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The Project does not conform to Prior Consideration guidelines.

DOE must check whether the WTG purchase are first hand or second based on PO

The Project does not stated that how is the project cost/ fund raised. Whether it is 100% equity, 70:30 , etc.

Based on the above information DOE must verify whether DPR/FSR given to DOE is same or is there as difference or change in version.

PPA must be thoroughly validated by DOE. 

Demonstration of additionality is not as the guidelines.

DOE needs to seriously validate the project properly especially additionality. 
Submitted by: MSL


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs