Project: 9044 Rio Picoiquen run off river power station - Crediting Period Renewal Request
[]
Project 9044: Rio Picoiquen run off river power station

- project design document (743 KB)

PDD appendices
Appendix 1 - ER spreadsheet (53 KB)

- crediting period renewal form (66 KB)
Methodologies Used ACM0002 ver. 20 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 3.0
Standardized baselines used N/A
Amount of Reductions 26,019 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (259 KB)
Renewal Date 02 Aug 22 (Renewable) Provisional (awaiting guidance from the CMP at CMP 16)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period (requested for renewal) 15 May 21 - 14 May 28

Other crediting period(s): 15 May 14 - 14 May 21
Requests for Issuance
and related documentation