10:03 01 Oct 26
Project:
4806 Sichuan Jinwa Hydropower Project
- Crediting Period Renewal Request
[]
| Project |
4806: Sichuan Jinwa Hydropower Project
- project design document (1179 KB)
PDD appendices Appendix 1 - ER calculation 4806 (75 KB)
- crediting period renewal form (174 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 19 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 1.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 495,216 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (436 KB)
|
| Renewal Date |
13 Dec 18
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
23 Aug 18 - 22 Aug 25
Other crediting period(s): 23 Aug 11 - 22 Aug 18 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER calculation 4806
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: