Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 3503 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Hebei Shengyuan Xuandong Coal Mine Methane Utilization Project |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE is requested to justify the choice of the benchmark (12% for coal and gas sector) considering that the project exports 100% of the power generated to the grid as the benchmark for the electricity sector in China for project IRR is observed to be 8%. In doing so, please refer to VVM version 1.2 paragraphs 112. 2. The DOE is requested to explain in details how it has validated: a) the amount of coal displaced, including the information on the amount of heat recovered, quantitatively demonstrating how it was used to derive the amount of coal displaced; and b) the net power exported to the grid by both phase I and phase II, in particular, to explain how it has considered the different auxiliary consumption rates (2.5% and 7.6%) and rated capacity (0.42 MW and 0.4 MW) for phase I and phase II respectively. In doing so, please refer to VVM version 1.2 paragraph 111. 3. The DOE is requested to clarify if it has considered all possible subsidies for coal mine methane utilization projects. In doing so, please refer to VVM version 1.2 paragraph 111 a. 4. The DOE is requested to further validate the sensitivity analysis in line with VVM version 1.2 paragraph 111 e. 5. The DOE is requested to explain how it has validated the grid emission factor used for the baseline emission calculations as per VVM version 1.2 paragraphs 90 and 91. In doing so, please confirm that the values used were the latest available values at the start of validation. |
|
Date | 20 May 11 |