Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 3289 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Ningxia Wulan Coal Mine Methane Power Generation Project |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE shall further explain how it validated the following parameters used in the IRR calculations: a) total investment cost, in particular, the details of the cross-checking with the contracts and the total figure; b) the operational costs in year zero (0) given that the plant started its operation in year one (1); c) the net power output, in particular the PLF of 77% and 90%; d) the applicable electricity tariff, in particular, the details of the similar projects in the region compared to; e) the VAT rate for the electricity tariff; and f) the inclusion of a CMM price while accepting the baseline to be the venting of CMM and the CMM price agreement made in June 2007, prior to the CDM consideration (November 2007). In doing so, refer to VVM version 1.1 paragraphs 110 and 112 c. In addition, the DOE is requested to provide details of the projects that were compared to the project activity such as the criteria to qualify as similar projects and the final use of the CMM (heat or electricity generation) of each project. 2. The PP/DOE shall provide details of the power purchase price and shall confirm whether there is on-site power consumption from the electricity produced by the project activity. In doing so refer to VVM version 1.1 paragraph 110 a. 3. The DOE shall validate the quantity of CMM that has been utilised for the heating of shaft and whether the same quantity will be used in the baseline scenario as per VVM version 1.1 paragraph 83. 4. The DOE shall further explain how it validated the continuation of CMM venting to be appropriate as the baseline scenario considering the enforcement of the national regulation to utilise CMM from January 2010. In doing so please refer to VVM version 1.1 paragraph 83. 5. The DOE shall further justify the elimination of alternative scenarios and the prohibitive barriers in detail, in particular: a) methane gas concentration for elimination of feeding into pipeline; and b) CMM utilisation in additional heat supply or captive electricity generation in line with VVM version 1.1 paragraph 82. 6. The DOE shall further validate the ex-ante grid emission factor applied; in particular, the source and the details of the data used to calculate the emission factor. In doing so, please refer to EB 43 paragraph 64.a. 7. The PP is requested to include separate monitoring parameters for the amount of pre-mining and post-mining CMM drained and utilised in line with page 41-42 of ACM 0008 version 6. |
|