03:17 02 Jan 26
Project
3200 :
Qinxin CMM Power Generation Project
| Project title |
Qinxin CMM Power Generation Project
- project design document (1597 KB)
PDD appendices Appendix 1 - Enclosure (147 KB)
Appendix 2 - Enclosure 1 (29 KB)
- registration request form (314 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (101 KB)
authorization (101 KB)
Authorized Participants: Qinxin Methane Power Generation Co., Ltd. |
| Other Parties Involved |
United Kingdom of Great Britain and Northern Ireland
, involved indirectly
approval (100 KB)
authorization (100 KB)
Authorized Participants: Trading Emissions PLC (withdrawn as of 24/11/2016) |
| Sectoral scopes |
8 : Mining/mineral production
10 : Fugitive emissions from fuels (solid, oil and gas) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0008 ver. 5 -
Consolidated methodology for coal bed methane, coal mine methane and ventilation air methane capture and use for power (electrical or motive) and heat and/or destruction through flaring or flameless oxidation
|
| Standardized baselines used | N/A |
| Amount of Reductions | 158,269 metric tonnes CO2 equivalent per annum |
| Fee level | USD 30153.8 |
| Validation Report |
Validation report (673 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 12/03/2012 MoC Annex 2 (Withdraw Project Participant) valid as of 24/11/2016 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 07/03/2012 |
| Registration Date | 13 Oct 10 (view history) |
| Crediting Period |
13 Oct 10 - 12 Oct 17
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Enclosure
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: