02:11 13 Jul 25
Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 3200 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Qinxin CMM Power Generation Project |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE is requested to confirm if all applicable government subsidies have been considered such as tax exemptions (income tax holiday) and VAT refunds in line with VVM ver. 1.1 paragraph 112 c. 2. The DOE shall further confirm whether the CMM gas was used in the baseline for heat generation. In doing so please refer to the VVM ver. 1.1 paragraph 86 c. 3. The DOE is requested to further justify the elimination of the baseline alternatives that are facing prohibitive barriers, in particular, for CMM flaring, power export to the grid and heat energy generation considering that it is not clear: (a) what exactly the publications on VAM utilization contain as the validation report only refers to sources and links; (b) what are the alternatives for the utilization of the CMM specified in the goals of the national climate change program and the targets outlined in the cleaner fossil fuels program report; and (c) how the current enforcement of the national regulation to utilize CMM gas is considered. In doing so, refer to steps 4 and 5, section II Baseline methodology procedure, ACM 0008 ver.5 and VVM ver. 1.1 paragraphs 86.d and 117. 4. The DOE is requested to further validate the applicability of the monitoring plan as the methodology, ACM0008v6 pages 42-43, requires that the quantity of pre-mining CMM (CMMBL,i,y) and post-mining CMM (PMMBL,i,y) should be included in the list of parameters to be continuously monitored ex-post. |
|
Date | 30 Jun 10 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: