Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 3196 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Lubanshan North and South Coal Mine Methane Utilization Project |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1.The DOE is requested to clarify the discrepancy of the net electricity generation as it is not clear whether the generation 465GWh/year is totally meant to be exported to the grid or not as the amount of power assumed in the IRR calculation is 323GWh/year. 2.The DOE is requested to validate the suitability of the tariff assumed in the IRR calculation as: a) the FSR assumed a tariff of 0.45RMB/kWh and the IRR calculation, 0.3478 RMB/kWh; and b) it is unclear whether the applied tariff in the IRR calculation was available at the time of investment decision. In doing so please refer to paragraph 6 of EB51. 3.The DOE is requested to justify the suitability of the benchmark as the project activity is designed to export electricity to the grid. 4.The DOE is requested to further validate the heating costs, boiler efficiency, coal price, methane concentration in the CMM, and the net calorific values of coal, in line with VVM version 1.1 paragraph 112 c. In doing so the DOE is requested to report each of the figures of the IRR input values. 5.The DOE is requested to further explain how CAR 7 -lifetime of the coal fired boilers- has been closed, considering that after 11 years the avoided costs for the boilers have not been accounted for in the IRR calculation. Please refer to VVM version 1.1 paragraph 198. 6.The DOE is requested to confirm if all applicable government subsidies have been considered, such as tax exemptions as income tax holiday, in line with VVM version 1.1 paragraph 112 c. 7.The DOE shall further justify the elimination of alternative scenario to utilise CMM for: a) additional captive power generation; and b) heat supply, including the annual heat consumption in the baseline scenario. Please refer ACM0008 v6, pp 7-8. 8.The DOE is requested to include the procedures taken to validate the combined margin grid emission factor according to EB 43, paragraph 64.a. Also, the DOE is requested to confirm the source of data used in the calculation as the validation report does not indicate the value or publication date. |
|
Date | 04 Oct 10 |