CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 3193 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Wayang Windu Phase 2 Geothermal Power Project |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE is requested to further substantiate the suitability of the: (a) benchmark applied in the context of the project activity; and (b) input values to the calculation of the benchmark and how the benchmark is derived, in particular risk free rate and beta value in accordance with para 13, Annex 58, EB 51. Further, the replicable version of the spreadsheets for benchmark calculation shall be provided in accordance with para 8, Annex 58, EB 51. 2. The DOE is requested to substantiate how it has validated the suitability of the input values to the investment analysis in accordance with paragraph 110 of VVM v1.1, in particular, total investment and well repair item when it is indicated that 2 wells will be replaced every 3 years. 3. The DOE is requested to further substantiate: (a) how it has validated the elimination of 10 geothermal power plants from the common practice analysis; and (b) the essential distinction between the proposed project activity and the Wayang Windu Phase 1 project, in accordance with the step 4 of the ‘Tool for the demonstration and assessment of additionality’, version 5.2 4. The DOE shall further substantiate: (a) whether the project activity is a capacity addition; and (b) the suitability of the identified baseline scenario in line with baseline methodology procedure of ACM0002 v9, given that the Wayang Windu geothermal field, which provides geothermal energy to the project activity, has already been providing geothermal energy to the Wayang Windu Phase I geothermal project since June 2000. |
|
Date | 21 Jun 10 |