07:57 05 Apr 26
Project:
3163 Chongqing Wanzhou Xiangjiazui Hydropower Station
- Crediting Period Renewal Request
[]
| Project |
3163: Chongqing Wanzhou Xiangjiazui Hydropower Station
- project design document (1082 KB)
PDD appendices Appendix 1 - ER calculation Xiangjiazui (149 KB)
- crediting period renewal form (160 KB)
|
|---|---|
| Methodologies Used |
AMS-I.D. ver. 18 -
Grid connected renewable electricity generation
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 18,511 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (259 KB)
|
| Renewal Date |
04 Oct 17
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
25 Dec 17 - 24 Dec 24
Other crediting period(s): 25 Dec 10 - 24 Dec 17 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER calculation Xiangjiazui
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: