Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedYunnan Saizhu Hydropower Project (2852)
DOE that requested for issuance and date of requestKFQ (31 Jan 11)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
The PPD in Page 33, states that “A connection with identical ammeters to the grid shown in Figure 6 will be built as backup. These two ammeters (M1’, M3’) function the same when the main connection (left one) is unavailable, thus the measurements of it on EGy,in and EGy,out are identical for the emission reduction calculation.” However, the back-up measuring system was not implemented as per the PDD. The DOE shall provide justification on how the verification requirements are met considering that the monitoring has not been conducted in accordance with the monitoring plan and the DOE has neither requested deviation from the monitoring plan nor raised any concern in its verification report with respect to the revision of the monitoring plan.
Date 08 May 11