Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 2639 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | VN08-WWS-04, Methane Recovery and Biogas Utilization Project, Lao Cai Province, Vietnam |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The PP/DOE should further explain how it has validated the project start date, in line with VVM paragraph 97 (i.e., confirm date of construction contract, date of purchase orders). 2.The PP/DOE should clarify the appropriateness of the grid emission factor used, its source and the inconsistency between the value mentioned in the PDD and the validation report. 3.The DOE should clarify how it has validated that the same baseline wastewater treatment system applies to the additional methane generation due to the increase in starch processing capacity considered in the project activity in line with EB 41, Annex 20, para. 16. 4. The PP/DOE are requested to ensure that the volume of wastewater treated (Qy,ww) will be monitored in line with the requirements of EB 41, Annex 20, para 12 (b). 5. The PP/DOE are requested to ensure that the monitoring of the kWproject is in line with the requirements of AMS-III.H v.9 and to amend this data parameter from kWproject to kWhproject. In addition, the PP/DOE should explain why the consumption of fossil fuel was not included in the monitoring plan as per the requirements of the same methodology (i.e., the PDD should provide a separate table in section B.7.1). |
|
Date | 01 Sep 09 |